Bond Architects completed the transformation of the former Briar Crest Elementary School into an Early Childhood Center for the Pattonville School District to accommodate growth and the need for a dedicated ECC space. Previously, the early childhood program was located in classrooms throughout the district’s elementary schools and Learning Center.
As the program grew, more classroom space was needed than what was available at these sites. Moving the early childhood program into one location also resulted in more classroom space being freed up in the elementary schools, enabling the district to maintain lower class sizes.
-
Client: Pattonville School District
Location: St. Ann, MO
40,000 SF
$1.9 M
Completed 2018
-
Feasibility Study
Cost Estimating
Space Planning
Programming
Architectural Design
Interior Design
Construction Documents
Construction Administration
-
Safety and security upgrades, including secure vestibule entry and remote lock-down hardware
Classroom sinks
OT room