Crestwood City Hall

Repair and restoration of a city hall’s architecture, infrastructure, and interiors.

After a flood in the building, Crestwood City Hall and Police Station had extensive damage to its interior finishes. In addition, the main entrance to the building was not wheelchair accessible and the skylights in the lobby were cracked and leaking. Finishes were updated in all the damaged areas and the board room received technology upgrades. A new ADA ramp was constructed to match the look of the main entry stairs. Leaking skylights were replaced and the roof was repaired to stop further leaks.

 
Previous
Previous

Washington Middle School

Next
Next

South Point Elementary School