Crestwood City Hall

Repair and restoration of a city hall’s architecture, infrastructure, and interiors.

    • Client: City of Crestwood

    • Location: Crestwood, MO

    • 28,600 SF

    • Est. $1.2 M

    • Completed 2021

    • Architectural Design

    • Interior Design

    • Construction Documents

    • Construction Administration

After a flood in the building, Crestwood City Hall and Police Station had extensive damage to its interior finishes. In addition, the main entrance to the building was not wheelchair accessible and the skylights in the lobby were cracked and leaking. Finishes were updated in all the damaged areas and the board room received technology upgrades. A new ADA ramp was constructed to match the look of the main entry stairs. Leaking skylights were replaced and the roof was repaired to stop further leaks.

    • New interior finishes

    • New bullet resistant dais

    • New microphones and speakers in board room

    • New TV displays in board room

    • New / upgraded lighting in board room

    • New existing skylights and repairs to existing roof

    • New ADA accessible entry ramp